To cope with the market needs for the systems which allows for diaphragm walls constructingTLC Group designed the discrete panels which meet expectations of the most demanding users.

TLC offers discrete panels in 3 basic lengths: 6, 9 and 12 meters. Elements can be connect together to get the required length. The variety of different widths of panels allows to suit them to every type of excavation

PRINCIPLE OF OPERATION WALLZIP

STEP 1

Placing of seal in groove

STEP 2

Placing of element in excavation

STEP 3

Diaphragm wall concreting

STEP 4

Removing of element from excavation

MAIN FEATURES OF THE WALLZIP SYSTEM:

  • Complete identity of all elements which allows for easy assembly
  • Very good construction stability
  • Replaceable bolts which allows for replacement if overused
  • Ergonomic seal groove which provides from sliding out the seal
  • Possibility of creating second groove for seal if required
  • The first and middle element is made of 25mm thick highly wear resistant steel sheet
  • The fixing end cut at 40O angle which allows for easy placement at the bottom of excavation
  • The highest quality system produced in certified production plant
  • Three basic lengths and five widths. For a client requirements possibility of producing individual sizes
  • All of the elements are reusable